Commercial
Springfield, OH
2026
The Six-Day Finish

More from this project

During

During

After

After

After

After

After

After

After
Six Days, Every Surface
Our crew handled the full interior painting scope for this commercial space, from surface prep to final touchups. We started with a coat of PVA primer on all walls and gypsum ceilings, then applied two finish coats for even, durable coverage. Doors were painted on site with direct-to-metal (DTM) paint, which bonds to metal surfaces and holds up to heavy daily use. We scheduled the work in phases, with the first coats, doors, and final coats each getting their own days. We also set aside a dedicated day at the end to touch up scuffs and wear left by other trades. The result was a clean, consistent finish delivered in six working days.