Commercial

Springfield, OH

2026

The Six-Day Finish

var(--variable-w2iOxXQot)

More from this project

var(--variable-w2iOxXQot)

During

var(--variable-w2iOxXQot)

During

var(--variable-w2iOxXQot)

After

var(--variable-w2iOxXQot)

After

var(--variable-w2iOxXQot)

After

var(--variable-w2iOxXQot)

After

var(--variable-w2iOxXQot)

After

var(--variable-w2iOxXQot)

After

var(--variable-w2iOxXQot)

After

A complete interior repaint of walls, gypsum ceilings, and doors for a commercial space, finished in six working days.

A complete interior repaint of walls, gypsum ceilings, and doors for a commercial space, finished in six working days.

Six Days, Every Surface

Our crew handled the full interior painting scope for this commercial space, from surface prep to final touchups. We started with a coat of PVA primer on all walls and gypsum ceilings, then applied two finish coats for even, durable coverage. Doors were painted on site with direct-to-metal (DTM) paint, which bonds to metal surfaces and holds up to heavy daily use. We scheduled the work in phases, with the first coats, doors, and final coats each getting their own days. We also set aside a dedicated day at the end to touch up scuffs and wear left by other trades. The result was a clean, consistent finish delivered in six working days.